// FEATURE

Scheduling & dispatch

Scheduling and dispatch in BuiltCRM puts jobs on a calendar by technician. Arrival windows follow each technician's ZIP coverage, working days and time zone, with a limit on jobs in each window.

A calendar for each technician

The calendar is organized by technician rather than treating the whole team as one schedule. When arranging a visit, the office can work with the person who will do the job and the time available on that person's calendar.

Each technician has their own ZIP coverage and working days. These settings connect the place a job needs to happen with the days that technician works, instead of assuming everyone covers the same area on the same days.

BuiltCRM scheduling & dispatch: Each employee sees their own jobs for the day. Names, phone numbers and addresses are fictional.
DAILY CALENDAR: Each employee sees their own jobs for the day. Fictional data.

Three-hour arrival windows

Visits use 3-hour arrival windows. The appointment is a window of arrival, not a promise that the technician will reach the door at one exact minute. The calendar gives the office and technician the same scheduled window to work from.

A minimum lead time of 60 minutes applies to scheduling. There is also a limit on jobs per technician per window, so a window has a capacity rather than an unlimited list of appointments. These are separate rules: a window needs both enough lead time and available capacity.

Coverage, working days and time zones

A technician's time zone is part of their setup alongside ZIP coverage and working days. When looking at a schedule, these settings matter together: the technician needs to cover the address, work that day and have space in the relevant arrival window.

Scheduling is connected to the technician's mobile calendar. The office arranges the job by technician, while each technician sees their own jobs and calendar on their phone. That keeps the appointment tied to the person assigned to carry it out.

Frequently asked questions

How long is an arrival window?
Arrival windows are 3 hours long. Scheduling also requires at least 60 minutes of lead time and follows the limit on jobs per technician per window.
Can technicians have different coverage?
Yes. Each technician has their own ZIP coverage, working days and time zone. The schedule is not based on one shared coverage list for everyone.
Where does the technician see the schedule?
Each technician sees their own jobs and calendar on the phone. The office uses the calendar by technician to arrange the visits.

Questions?Call us:(404) 882-1219